Close

Spire Credit Union

New construction of a branch location near existing retail shops.

Maple Grove Credit Union

Project – Spire Credit Union

Spire Credit Union hired Greiner Construction to construct a new 6,800 square foot branch location near existing retail stores in Maple Grove.

The scope of work included sitework with the preservation of specific existing trees, addition of new curb and gutters, and the construction of the single-story building.

The structural steel building has a lobby/waiting lounge, offices, a conference room, restrooms, employee breakroom, a data room, and a janitor’s storage area. The drive-up teller window has bullet-resistant windows and frame, and an after-hour deposit drop box that is fully secured. This credit union has a metal panel, stone, and brick exterior.

With 33 surface parking stalls, construction of this project was completed in 4 months. This allowed SFCU to move their existing branch location from a nearby strip mall to the new facility prior to their 2013 opening.

The scope of work included sitework with the preservation of specific existing trees, addition of new curb and gutters, and the construction of the single-story building.

About this project

  • Location:

    Maple Grove, MN

  • Services:

    New Construction
    Design/Build
    Pre-Construction

  • Markets:

    Workspace/Office
    Financial

Additional locations serviced by Greiner include:

  • Blaine

  • Eagan

  • Eden Prairie (new construction)

  • Princeton

  • Minneapolis

  • Roseville

  • St. Paul

  • Woodbury