Close

Associated Bank

First floor renovation of building while second floor is occupied.

Associated Bank

Eden Prairie

Associated Bank hired Greiner Construction to complete an interior renovation to the first floor of an existing structure located in Eden Prairie.

The ground level remodel of the two-story building, that was previously occupied by a financial institution, consisted light demolition and a complete renovation while the second story was fully occupied.

The scope of work entailed the replacement of the concrete front entry way, new teller line approach, canopy, TV/speaker system for the drive up teller lines, exterior signage, parking lot lighting, ADA ramps, new security system, entry doors, and the complete renovation of interior including break room, offices, and hospitality line with high end mill work.

A challenge during this renovation was with the fast-tracked schedule, as every item was delivered and installed within a day. This project was successfully completed within six (6) weeks.

Additional locations that Greiner has provided construction services to for Associated Bank include:
Savage, MN
Inver Grove Heights, MN

Ensuring consistency in each of Associated Bank's remodels, Greiner assisted the owner in developing material standards for items such as locks, hardware and access control.

About this project:

  • Services

    Pre-Construction
    Construction

  • Markets

    Financial